在電纜橋架安裝完成后,就要進(jìn)行電纜的鋪設(shè),山東電纜橋架公司提示大家,電纜鋪設(shè)我們要進(jìn)行檢查,嚴(yán)格按照規(guī)定程序進(jìn)行,保證施工的質(zhì)量和日后使用的可靠性。
After the installation of cable bridge is completed, cable laying should be carried out. Shandong Cable Bridge Company reminds you that cable laying should be inspected and carried out in strict accordance with the prescribed procedures to ensure the quality of construction and the reliability of future use.
一套合理的電纜橋架鋪設(shè)順序是這樣的:
A reasonable sequence of cable bridge erection is as follows:
1、測(cè)量定位,確定安裝橋架的支架安裝位置,經(jīng)檢查確認(rèn)支架合格后,才能安裝橋架;
1. Measure and locate the position of the bracket to install the bridge. After checking and confirming that the bracket is qualified, the bridge can be installed.
2、橋架安裝后也要經(jīng)過檢查,只有合格后才能進(jìn)行電纜的敷設(shè);
2. After the installation of the bridge frame, it should also be checked. Only after qualified can the cable be laid.
3、對(duì)于電纜,在敷設(shè)前進(jìn)行絕緣測(cè)試合格,才能敷設(shè);


3. For cable laying, the insulation test is qualified before laying.
4、電纜電氣交接試驗(yàn)合格,且對(duì)接線去向、相位和防火隔堵措施等檢查確認(rèn),才能通電。
4. Electrical connection test of cable is qualified, and check and confirm wiring direction, phase and fire-proof and blocking measures, etc. before power can be turned on.
以上的內(nèi)容由山東電纜橋架公司友情提供,更多精彩內(nèi)容請(qǐng)收藏我們的官網(wǎng):http://198780.com謝謝支持。
The above content is provided by the friendship of Shandong Cable Bridge Company. For more wonderful content, please collect our official website: http://198780.com. Thank you for your support.
上一篇:電纜橋架安裝常見質(zhì)量缺陷問題
下一篇:山東電纜橋架接地電阻的注意事項(xiàng)
下一篇:山東電纜橋架接地電阻的注意事項(xiàng)
相關(guān)文章 / Recommended news
- 山東電纜橋架 “不堪重負(fù)”?這些后果遠(yuǎn)比你想象的嚴(yán)重!
- 電纜 “退燒” 有妙招:網(wǎng)格橋架散熱效率飆升 70% 的實(shí)戰(zhàn)攻略
- 橋架配件大揭秘:各司其職的 “管線守護(hù)者”
- 濟(jì)南電纜橋架:強(qiáng)酸環(huán)境如何選橋架
- 電纜橋架 “散熱” 爭(zhēng)奪戰(zhàn):誰才是熱量克星?
- 電纜橋架的“早衰”之謎:為何同款產(chǎn)品壽命大不同?
- 從橋架事故看安裝規(guī)范的重要性
- 濟(jì)南梯式橋架:電氣布線系統(tǒng)的骨干支撐
- 電纜橋架鏈接件的多樣化連接方式解析
- 山東電纜橋架通用蓋板技術(shù)解析與應(yīng)用指南